NEW ORBITAL HIGHWAY 2

Project Overview

The project consists on design and construction of 47 Km of motorways network with a five-lane dual carriageway for light vehicles and two truck lanes in each direction, 6 viaducts, 17 bridges and underpasses and a 320-metre cut-and-cover tunnel including 8 grade-separate interchanges with cross roads, collectors-distributors, overpass and underpass structures, pedestrian and bicycles paths, landscape, hardscape and artscape.

The project will connect the North Relief Road with Salwa Road, the highway will bypass Doha and relieve current traffic congestion while preparing to accommodate projected road traffic increases.

Our Mission
Setec Egypte was assigned to:
Junction 6:
  • Braid 06A
  • Braid 06B
  • Braid 06C
  • SHARED UNDERPASS 6A APPROACH WALLS
Junction 12:
  • Braid 12A
  • Braid 12B
  • Braid 12D
QP Protection:
  • QP Protection 16+292
  • QP Protection 16+632
TSE Chambers

Our Scope
Setec Egypte was responsible to carry out the detailed structural formwork and reinforcement shop drawings.


KEY FACTS


  • Country: Qatar
  • Client: QDVC Joint-Venture Bin Omran
  • Consultant: Hyder Consulting Middle East Limited
  • Period: Q3-2015 Ongoing Project