TAMARINS ROAD

Project Overview
The road links the administrative centers of the island at Saint Paul and Etang-Salé via Saint-Denis in the north and Saint-Pierre in the south. The road crosses a high-altitude region with terrain marked by ravines, gorges and cliffs. This means traversing 120 gullies and the construction of 48 civil engineering structures, four of which are large viaducts. There are nine interchanges, three tunnels and 23 bridges (interchanges are at St Paul, Plateau Caillou, the Eperon, the Hermitage, the Dam, the Colimaçons, Stella, Portal, and l'Etang-Salé).

Our Mission
Setec Egypte was assigned to 7 Hydraulic bridges structures.

Our Scope
Setec Egypte was responsible for Carrying out shop drawings for several parts of this project and the corresponding BOQ.


KEY FACTS


  • Country: France
  • Owner: Region Réunion
  • Client: Prodetis
  • Consultant: Scetauroute
  • Main Contractor: Vinci Construction
  • Period: 2007-2008