Cairo Metro Line 3 Phase 3
Project Overview
Line 3 Phase 3 is from Attaba to exist shaft after Sudan Station (Phase 3A), then north branch to Imbaba (Phase 3B) and the south branch to Mohandisine (Phase 3C), 17.7 km and 15 stations.
setec Egypte was assigned for 6 Metro Stations (Rod Al Farag, Ring Road, El-Kawmeiah, El-Bohy, Boulak and Cairo University)Our Mission
Complete Structural Analysis, Design and Detailed Shop drawings for all the structural elements for the six stations, including:
- 3D SOFISTIK calculation model, integrating: (All vertical and lateral loads, Seismic, fire, vibration calculations and Simulation of construction phases with nonlinear analysis).
- Calculation notes for reinforced concrete, composite and steel structures.
- Steel assembly calculations by FIDES software.
- TEKLA 3D model for steel structures.
- Revit 3D model for reinforced concrete structures.