FRESSENHEIM NUCLEAR PLANT
Project Overview
Water supply of some cooling circuits of nuclear site. The pumping of groundwater in envisaged in different sites.
Each well is designed to obtain a flow rate of 50m3/h and consists of:A completely buried part that captures the groundwater and whose characteristics (depth, width) may depend on the site;
A reinforced concrete building partially buried called “tête de puits” which interfaces the well itself and the gutter of discharge.
Our Mission
Setec Egypte was in charge of making detailed design for a water pump house.
Our Scope
Setec Egypte was responsible for making detailed design with the shop drawings, and the corresponding BOQ based on the guidelines drawings.