High Speed 2 Railway
HS2 is a new high-speed railway linking up London, the Midlands, the North and Scotland serving over 25 stations, including eight of Britain’s 10 largest cities and connecting around 30 million people. The construction of the new railway is split into three phases – Phase One linking London and the West Midlands; Phase 2a linking the West Midlands and the North via Crewe; and Phase 2b completing the railway to Manchester and Leeds. By building a new railway line, HS2 takes fast trains off the existing railway and places them on to their own dedicated tracks, better connecting major towns and cities. This then allows slower, local trains to bunch up on the existing lines, freeing up space across the country for many more commuter services and freight trains.
setec Egypte is responsible for making technical studies, reinforcement shop drawings based on the guide line drawings - 3D models provided bu setec TPI. Drawings are based on british standards and specific requierement from the UK and rise the construction methodology, calculation notes and project specifications transmitted by the client.