INCITY TOWER

Project Overview
Construction of the highest tower in Lyon City with:
  • 39 floors
  • 200 m at its tip
  • 170 m high point for the cover
  • 41 780 m2 of rental space


Our Mission
Setec Egypte was responsible for preparing the detailed structural design drawings for all the horizontal elements.

Our Scope
Setec Egypte was responsible for the reinforcement shop drawings and the corresponding bar bending schedule for all the concerned structural elements.


KEY FACTS


  • Country: France
  • Owner: Sogelym-Dixence
  • Client: Egis
  • Architect: Valode & Pistre/ AIA Architctes
  • Contractor: Bouygues Batiment
  • Period: 2013-2015