JEDDAH-MAKKAH HIGHWAY LINK PHASE 2
Project Overview
Construction of 16kms road works, including one Interchange and bridge.
Our Mission
Setec Egypte establish the preliminary and detailed design for two interchanges.
Our Scope
Setec Egypte was responsible for:
- Preparing the Detailed design including design drawings and calculation notes for all the structural elements for two bridges
- Preparing Structural Shop- drawings
- Establishment of the corresponding Bar Bending Schedules and Bills Of Quantities (BOQ)