Project Overview

This new unit will replace existing units 4-7 and will make Mae Moh the first lignite-fired power plant in Asia operating with ultra-supercritical conditions. Upon its completion in 2018, the unit will produce 600 MW of electricity with the highest environmental performance and with atmospheric emissions reduced to meet the most stringent regulations.



Our Mission
Setec Egypte was assigned to the turbine hall, equipment foundations and tanks.

Our Scope
Setec Egypte was responsible to carry out the detailed structural formwork and reinforcement shop drawings.


KEY FACTS


  • Country: Thailand
  • Client: Setec Energy
  • Owner: Electricity Generating Authority of Thailand
  • Period: 2015 - 2016