MONTEREAU THERMAL POWER PLANT

Project Overview
The EDF Group reached an important stage in its program to increase production capacity in France by bringing two new oil-fired turbines into operation at Vaires-sur-Marne (Sene-et-Marne) with a total capacity of 370 MW. These facilities have been built to meet peak production needs, in other words demand during periods of maximum consumption, and will operate for several hundred hours a year.

Our Mission
Setec Egypte was assigned to some buildings.

Our Scope
Setec Egypte was responsible for preparing the structural shop drawings and the corresponding BOQs.


KEY FACTS


  • Country: France
  • Client: Setec
  • Owner: Electricité de France (EDF)
  • Period: 2008 - 2009