RER C- ZAC PARIS-BATIGNOLLES

Project Overview
The Construction of a bridge 240m long to support railway road part of ZAC Clichy-Batignolles Development in Paris. It is consisted of three parts; part of steel structure above the RER line C, part of concrete structure above the RER line C and finally part of concrete structure above the RER C line tunnel.

Our Mission
Setec Egypte was assigned to make complete structural design for a slab bridge covering the metro line RER C.

Our Scope
Setec Egypte was responsible for Structural works starting from modeling & analysis, passing through detailed design calculations notes, detailed formworks and reinforcement shop drawings and finally As-built drawings for all the structural elements.


KEY FACTS


  • Country: France
  • Client: RAZEL GROUP
  • Main Contractor: RAZEL GROUP
  • Period: 2011-2012