RODEZ HOSPITAL

Project Overview
Construction of a new hospitals Complex with a total built-up area of 50.000 sqm and 400 beds.

Our Mission
Setec Egypte was responsible for Updating structural detailed design drawings in accordance with the executed project.

Our Scope
Setec Egypte was responsible for carrying out the As-Built reinforcement workshop drawings.


KEY FACTS


  • Country: France
  • Client: Eiffage
  • Architect: Valode et Pistre
  • Contractor: Eiffage, Cari, Lagarrigue BTP & Andriew BTP
  • Period: 2004