Sharjah - Waste to Energy Plant

Project Overview

300 000 t per year Waste to Energy Project – 30 Mwe, 30 years.



Our Mission
  • Calculation Notes justifying the all-concrete sections.
  • Revit Structure Model.
  • Formwork drawings and reinforcement shop drawing with bar bending.




KEY FACTS


  • Country: United Arab Emirates
  • Client: Setec Energie et Environement
  • Contractor: CNIM
  • Period: 2019- Ongoing